Zagros Tunnel
Project Introduction

1. Construction of Tunnel with The 

Diameter of 6m & Length of 1,000 m
2. Construction of Drilling and Grouting Gallery
Whit Length of 1,000 m
3. Construction of Diversion Dam Whit
Length of 89 m & Height of 14 m
4. Construction of Water Distribution
network with Length of 150 km
5. Shaft with Depth of 140 m &
Diameter of 8 m & Concrete: 31,000 m3
Rebar Work: 3,200 Ton
Excavation: 435,000 m3
Tunnel Excavation: 75,000 m3
Drilling & Grouting: 133,000 m
Water Transfer Lines & Pump Station: 
150 km