Project Detail

Construction of Tehran- Shomal Freeway -Zome 1(Lot B2)
Project Introduction

- Project Properties :

- Road Construction : 7+185 km
- Bridge Building length: 750m
-Tunnel Excavation: 980 m (Double Arc NATM)
- Tunnel Concrete Lyning: 2625 m
-Retaining Wall: 2100 m
-Trench consolidation : 2500 m
-Concrete casting: 125000 m3
-Excavation : 1880000 m3
-Filling: 588700 m3
-Rebar Works: 7145000 kg