Project Detail

Zemkan Dam
Project Introduction

- Project Properties:

Earth fill Dam with clay core

1. High of dam 65m

2. Excavation 400000 m3

3. Filling 700000 m3

4. Clay core 180000 m3

5. Filter 60000 m3

6. Drain 41000 m3

7. Rip Rap 26000 m3

8. Drillling and grouting 70000 m3

9. Concrete 35000 m3